Using the screwdriver and hammer run along the length of the landing tread to hammer down the remaining carpet onto the track strip making sure the end of the carpet is not exposed.
Carpet transition at top of stairs.
Tuck the extra edge of the carpet under the gap and use the hooks of the transition strip to hold it in place.
I believe here are my options to correct this.
New carpet will be installed so some sort of transition piece can be used if possible.
The end result should be a smooth transition from the landing tread to the carpet floor.
Do we have the wood floor on the very top stair on the landing which will be be higher than the rest of the stairs o.
At the top of the stairs cut back the wall baseboard to allow room for the nosing.
Most of the stairs have an overhang that may need to be cut off.
What is the best way to achieve the transition.
Then follow the same steps as above after you finish installing the tile.
In this particular case we installed new carpet on the stairs and laminate flooring on the upstairs hallway.
Always try to transition materials on an inside corner.
1 cut the sub flooring in that small area and replace it so the transition between the carpet and stair tread is level and acceptable.
It seems the norm is wood to carpet.
And it sure beats having that carpet up at the top run all the way down the stairs.
Or the space beneath the hang can be filled in with wood.
2 bevel cut the back edge of the stair tread to minimize the height difference.
Check out our vast selection of landing treads online.
That pic above is how you transition the upstairs carpet to the stair.
Not beautiful but not that noticeable really.
Or you can have laminate on the stairs and need to finish the carpet up to the top stair of laminate.
3 use some sort of transition piece between the stair tread to carpet when new carpet is installed.
4 test fit the transition trim placing it along the seam and gently stepping on.
Pull the carpet over the top using a knee kicker.
Call us at 1 800 656 9862 carpet transition from the top riser of a stair using a z bar.
Most often the top stair will involve installing a stair nose.
Hey all we want to have a carpet stairs leading to a semi solid engineered plank wood landing.
If there s already a carpet there cut it just a few inches longer than where you want to meet the tile.
At the top of the stairs nose molding will cover the seam similarly if the vinyl flooring ends at the stair edge.
Professional installers prefer to start at the bottom of the staircase and finish each step before moving on to the next one.